Ceilings: Remove and replace ceiling tiles; patch and repair the existing ceiling grid as needed. - Lighting: Remove existing fixtures and install new 2' x 4' flat panel lights. - HVAC: Replace HVAC diffusers. - Walls: Remove wall carpet and wood trim, clean adhesive from exposed brick, prepare surfaces, and paint. - Mandatory site meeting: October 29, 2026, at 10:30 a.m. at the school’s front office. On-time…
Flooring: Remove existing flooring and wall base; install carpet tile, walk-off tile, stair carpet, luxury vinyl plank, and rubber base. Include substrate preparation, testing, and second-floor subfloor refastening. - Painting and finishes: Patch and paint interior surfaces and exterior balcony railing, fascia, and wood supports; coat the concrete patio and replace exterior dimensional letters. - Plumbing: Replace…
This bid is for architectural and engineering design services for a medication-assisted treatment area renovation at the Adult Detention Center, approximately 3415 S 900 W, South Salt Lake, UT 84119. - Services: Programming, schematic design, design development, construction documents, cost estimating, bidding support, construction administration, closeout, and one-year warranty support. - Maintenance relocation:…
Scope as published by the buyer, or our plain-English summary of it. Open the listing above for the full solicitation.
Of the 3 open construction & renovation contracts in Utah, none are federal3 are state or local. That split matters: federal work runs through SAM.gov and needs a UEI and an active SAM registration, while state and local buyers each run their own portal with their own vendor sign-up. XL Eagle already holds both.
Posted on: Bonfire (3)
Closed in the last 90 days. Useful for pricing and for seeing which buyers order this work again.
Most construction & renovation firms never bid government work because the overhead is the barrier, not the job: SAM registration and a UEI, reps and certifications, bonding on larger jobs, wage determinations, and a different submission portal for almost every buyer. That is administrative work, not trade work.
XL Eagle bids as the prime contractor. We carry the registrations, write the proposal, own the compliance and submit through whichever portal the buyer uses. You price the work and perform it as our subcontractor. There is no fee to you and no registration for you to maintain.
3 live construction & renovation opportunities in Utah as of October 30, 2026. The list is rebuilt daily.
For the federal solicitations, yes — a UEI and an active SAM.gov registration. State and local buyers use their own portals instead. Working through XL Eagle as the prime, you need neither: we hold the registrations and submit the bid.
A mix of federal agencies and state and local buyers; the current list is on this page.
Nothing up front. XL Eagle bids as the prime contractor and the businesses that perform the work are paid as subcontractors on the awarded contract.
Construction & Renovation contracts in every state · How to win government construction & renovation contracts · NAICS 236115: New Single-Family Housing Construction (except For-Sale Builders) · Subcontract construction & renovation work through XL Eagle · All Utah state and local bids
Transportation & Hauling (3) · IT Services & Software (2) · HVAC (2) · Environmental Services (1) · Welding, Fabrication & Machining (1) · Maintenance & Repair (1) · Janitorial & Cleaning (1) · Electrical (1) · Landscaping & Grounds (1) · Flooring (1) · Water & Wastewater · Fuel & Petroleum