Systems: Furnish and install access control, video surveillance, intercoms, credentialing workstations, recording/server equipment, and network switches; integrate existing equipment designated for reuse.
Due
November 5, 2026
6 days left
Location
West Virginia
Posted on
prd311.wvoasis.gov
Notice ID
CRFQ-0211-GSD2700000019
What they need
InfrastructureInclude selective removal, copper and fiber cabling, raceways, racks, power connections, door-control interfaces, and required patching and restoration.
InstallationPhase migration to maintain security in occupied buildings; include required evening and weekend work.
CompletionPrioritize Logan within 180 days and Weirton within 270 days; overall substantial completion within 360 days.
Turnover and warrantyInclude testing, commissioning, training, record drawings, and a five-year parts and labor warranty.