The original documents
Deadline: January 5, 2027
See the original on spokane.procureware.com
Bidding it yourself? Get the full package and submit on spokane.procureware.com before January 5, 2027.
What they need
- System size24 pressure zones, 16 sub-pressure zones, 37 reservoirs, 27 booster stations, 8 well stations, and approximately 1,170 miles of water mains.
- Model updateClean and update the existing Autodesk InfoWater Pro model using GIS, infrastructure records, SCADA, and available meter data; verify pump controls, pump curves, and pressure-reducing valve settings.
- CalibrationInclude summer and winter field testing, data collection, and steady-state and extended-period calibration following AWWA M32 standards. Simulations must cover at least 24 hours, preferably 48 hours or more.
- Scenarios and deliverablesProvide existing, 20-year, and 50-year scenarios, an updated hydrant fire-flow scenario, water-loss findings, and a calibrated model and report meeting WCAG 2.1 accessibility requirements. Account for August 2026 fire impacts and future service areas.
- ScheduleAnticipated start March–April 2027; summer data collection in 2027, winter collection by spring 2028, and model/report delivery targeted for early 2028.
- QualificationsFirm and project lead must each have at least five years of InfoWater Pro calibration experience.
- Optional pricingSeparately price an action plan for SCADA, AMI, and GIS integration toward a digital twin.
Get new Washington bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More Washington bids → · All states →