This bid is for on-call floodplain consulting and stormwater engineering support in Spokane Valley, Washington, coordinated through 10210 E Sprague Avenue, Spokane Valley, WA 99206.
Due
December 3, 2026
7 days left
Location
Spokane Valley, WA
Washington
Posted on
spokanevalleywa.gov
Notice ID
Request for Qualifications - On-Call Floodplain Administrati
Please quote on-call floodplain consulting and stormwater engineering support for Spokane Valley, Washington, coordinated through 10210 E Sprague Avenue, Spokane Valley, WA 99206.
Scope: Review development plans, hydrologic and hydraulic analyses, calculations, and floodplain application documents across six floodplain areas.
Expertise: Certified Floodplain Manager oversight; experience with HEC-RAS, HEC-HMS, HSPF, FLO-2D, TR-20, and WSP2, plus map revisions, elevation certificates, and No-Rise certifications.
Support: Stormwater design, meetings, public outreach, flood-event assistance, and project documentation as needed.
Turnaround: Review responses within 15 days of receiving submissions unless otherwise agreed.
Term: Anticipated start February 1, 2027, through December 31, 2029, with a possible three-year renewal; work is as needed with no guaranteed minimum.
Insurance: $1 million auto liability; $2 million general liability per occurrence and aggregate; $2 million professional liability per claim and aggregate.
Please confirm availability and send your quote by December 3, 2026.
What it takes to win this job
No close past price for this exact job. We found fewer than 3 past awards for this same work, which is too few to give a fair price.
Price it from your own costs. Ask the buyer who does this work now and what they pay.
To win it, you need
Qualified oversight: Provide Certified Floodplain Manager oversight.
Insurance: Carry $1 million auto liability, $2 million general liability per occurrence and aggregate, and $2 million professional liability per claim and aggregate.
Review timing: Respond to reviews within 15 days of receiving submissions unless otherwise agreed.
Quote contents: Confirm availability and provide hourly rates and applicable expenses.
Deadline conflict: The quote request says December 1, 2026, but the posting lists December 3, 2026.
The original documents
Deadline: December 3, 2026
See the original on www.spokanevalleywa.gov
Bidding it yourself? Get the full package and submit on spokanevalleywa.gov before December 3, 2026.
What they need
ScopeReview development plans, hydrologic and hydraulic analyses, calculations, and floodplain application documents across six floodplain areas.
ExpertiseCertified Floodplain Manager oversight; experience with HEC-RAS, HEC-HMS, HSPF, FLO-2D, TR-20, and WSP2, plus map revisions, elevation certificates, and No-Rise certifications.
Additional supportStormwater design, meetings, public outreach, flood-event assistance, and project documentation as needed.
TurnaroundReview responses within 15 days of receiving submissions unless otherwise agreed.
TermAnticipated start February 1, 2027, through December 31, 2029, with a possible three-year renewal; work is as needed with no guaranteed minimum.
Insurance$1 million auto liability; $2 million general liability per occurrence and aggregate; $2 million professional liability per claim and aggregate.
Other recent awards in this industry in Washington
Recent federal contract awards (federal buyers) in the same industry in Washington, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.