This bid is for stormwater infiltration system engineering design on North Curson Avenue, just north of Santa Monica Boulevard, in West Hollywood, California.
Due
December 15, 2026
24 days left
Location
West Hollywood, CA
California
Posted on
vendors.planetbids.com
Notice ID
148374
Please quote stormwater infiltration system engineering design for North Curson Avenue, just north of Santa Monica Boulevard, in West Hollywood, California.
Qualifications: California-licensed civil engineer with qualified survey and geotechnical professionals.
Site investigations: Topographic and boundary survey, utility research and coordination, 6 to 12-inch-wide slot trench exploration across proposed interceptor and drywell footprints, and geotechnical and infiltration testing with reports.
Analysis: Independently verify the contributing drainage area and size drywells for the 85th-percentile runoff volume using measured infiltration rates.
Design: Include catch basin interception, pretreatment, piping, overflow bypass, maintenance access, surface restoration, and traffic control.
Deliverables: Concept design, 75% and 100% construction documents, and final signed and sealed plans, specifications, quantities, and cost estimates, plus coordination and permitting support.
Extra support: As-needed bidding and construction support, with allowances of $5,000 and $15,000 respectively.
Please confirm availability and send your quote by December 15, 2026.
The original documents
Deadline: December 15, 2026
See the original on vendors.planetbids.com
Bidding it yourself? Get the full package and submit on vendors.planetbids.com before December 15, 2026.
What they need
QualificationsCalifornia-licensed civil engineer with qualified survey and geotechnical professionals.
Site investigationsTopographic and boundary survey, utility research and coordination, 6–12-inch-wide slot trench exploration across proposed interceptor and drywell footprints, and geotechnical/infiltration testing with reports.
Analysis and designIndependently verify the contributing drainage area and size drywells for the 85th-percentile runoff volume using measured infiltration rates. Include catch basin interception, pretreatment, piping, overflow bypass, maintenance access, surface restoration, and traffic control.
DeliverablesConcept design, 75% and 100% construction documents, and final signed/sealed construction plans, specifications, quantities, and cost estimates; include coordination and permitting support.
PricingSeparate lump-sum fees by task, a proposed design schedule, and investigation assumptions. Provide fully burdened hourly rates for as-needed bidding and construction support, with respective allowances of $5,000 and $15,000.
Other recent awards in this industry in California
Recent federal contract awards (federal buyers) in the same industry in California, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.