This bid is for groundwater treatment operations, maintenance, and monitoring at Handy Andy #8, 3314 NE 44th Street, Vancouver, Washington, including treatment facilities at 2815 NE 42nd Street and 2818 NE Cherry Road, Vancouver, Washington.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before December 10, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
System maintenance: Maintain continuous groundwater capture and treatment using two granular activated carbon vessels, with biweekly inspections, PLC/HMI and Sensaphone monitoring, alarm response, and three carbon media changes annually.
Sampling: Quarterly influent/effluent testing; semiannual low-flow sampling of four groundwater wells with duplicate samples; quarterly sampling of four seeps and one tributary. Include laboratory analysis for gasoline-range organics and BTEX, plus required treatment discharge parameters.
Additional work: Include annual system cleaning, well and outfall inspections, non-routine repairs, and sampling of eight additional wells once during the initial pricing period.
Reporting and staffing: Include monthly updates, annual monitoring reports and data uploads, a Washington Licensed Geologist, and 40-hour HAZWOPER-trained field personnel.
Pricing: Provide total and monthly fixed pricing for routine maintenance over the initial 15-month period through June 30, 2028, plus hourly rates and itemized costs for repairs, monitoring, and reporting. Include labor, laboratory testing, materials, travel, subcontractors, and a standard portable restroom.