This bid is for Ethernet wireline or fixed wireless service at six Washington locations: 1338 SW Old Clifton Rd, Port Orchard, WA 98367-9113; 2321 W Dayton Airport Rd, Shelton, WA 98584-0974; 191 Constantine Way, Aberdeen, WA 98520-9504; 1301 N Ephrata Ave, Connell, WA 98326; 222 N Havana St, Ste 20
Due
December 2, 2026
24 days left
Location
Port Orchard, WA
Washington
Posted on
pr-webs-vendor.des.wa.gov
Notice ID
27-RFQ-018
Please quote Ethernet wireline or fixed wireless service for six locations in Port Orchard, Shelton, Aberdeen, Connell, Spokane, and Forks, Washington.
Speeds: 10 Mbps at Port Orchard; 1 Gbps each at Shelton, Aberdeen, and Connell; 100 Mbps each at Spokane and Forks.
Installation: Complete within 90 days for Port Orchard and 150 days for all other sites; give your earliest guaranteed installation time.
Connections: Extend service to Room 412 MDF at Port Orchard, D1405 at Aberdeen, T004 at Connell, and Suite 203 at Spokane; place equipment within 10 feet of the customer device at Port Orchard, Shelton, Spokane, and Forks.
Port Orchard: Use existing pathways, provide drawings before installation, mount exterior equipment no higher than six feet, supply equipment that supports future speed upgrades, and set the connection to negotiate automatically.
Site access: Coordinate secure-site access at Shelton, Aberdeen, Connell, and Forks; background checks are required at Aberdeen, Connell, and Forks.
Forks: Give 48-hour access notice, bring photo ID, obtain approval for building alterations, and provide a copper connection with automatic negotiation and support for data packets of at least 1600 bytes.
Please confirm availability and send your quote by December 2, 2026.
The original documents
Deadline: December 2, 2026
See the original on pr-webs-vendor.des.wa.gov
Bidding it yourself? Get the full package and submit on pr-webs-vendor.des.wa.gov before December 2, 2026.
What they need
Bandwidth10 Mbps at Port Orchard; 1 Gbps each at Shelton, Aberdeen, and Connell; 100 Mbps each at Spokane and Forks.
InstallationComplete within 90 days for Port Orchard and 150 days for all other sites. Include your earliest guaranteed installation interval.
HandoffsExtend service to the designated equipment rooms: Room 412 MDF at Port Orchard, D1405 at Aberdeen, T004 at Connell, and Suite 203 at Spokane. Equipment must be within 10 feet of the customer device at Port Orchard, Shelton, Spokane, and Forks.
Port Orchard requirementsUse existing pathways, provide installation drawings before work, mount exterior equipment no higher than six feet, and supply equipment capable of future bandwidth upgrades. Set duplex to auto-negotiate.
Access and Forks requirementsSecure-site access coordination applies at Shelton, Aberdeen, Connell, and Forks; background checks are required at Aberdeen, Connell, and Forks. Forks requires 48-hour access notice, photo ID, approval for building alterations, a copper auto-negotiate handoff, and minimum 1600-byte MTU.
PricingItemize monthly recurring and one-time charges per site, including all installation, equipment, cabling, permits, labor, and fees, excluding taxes. Identify the local loop type and include at least one alternate bandwidth option per site.