#3 stone: 100 tons total; stockpile 60 tons at (36.96051, -77.04961) and 40 tons at (36.95528, -77.06452).
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Virginia bid is posted.
What the job is
#57 stone: 140 tons total; stockpile 20–40 tons at (36.93986, -77.0452) and tailgate spread 100–120 tons from Joe Brown Gate to the 4-Way intersection and from that intersection to Cedar Sign Post Road. Final allocations may vary within the total.
Material quality: Meet the latest Virginia Road and Bridge Specifications.
Delivery: As requested through January 31, 2027, weather permitting; deliver within one week of notification and provide 24–48 hours’ advance delivery notice.
Pricing: Include stone prices per ton, hauling for 240 tons, tailgate spreading, and fuel surcharges for 12 truckloads.