This bid is for a dispatch office renovation at 305 4th Street NW, Charlottesville, VA 22903.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Virginia bid is posted.
What the job is
Demolition: Remove designated walls, doors, flooring, ceiling grid, insulation and lighting; retain identified hardware and fixtures for reuse.
Walls and doors: Install insulated metal-stud partitions to roof deck with 5/8-inch Type X drywall on both sides; four 3-foot by 7-foot full-lite solid-core wood doors with hollow-metal frames; repair damaged finishes and install 6-inch vinyl cove base.
Flooring: Polish approximately 974 square feet of concrete to Level 2 satin finish with Class B salt-and-pepper exposure, densifier and anti-slip treatment. Include a mockup and protect floors during construction.
Ceiling: Install new white 15/16-inch suspension grid and 24-by-24-inch Armstrong Ultima High NRC BP1940 tiles or approved equal.
HVAC and electrical: Modify supplies, returns and insulated ductwork; include third-party NEBB-certified balancing of AHU-3. Install LED panels, dimming controls, outlets and data conduit; relocate designated alarms. Data cabling is excluded.
Site requirements: Occupied facility; include HEPA dust control, HVAC protection, debris disposal and a portable restroom. Loud or odorous work requires nights or weekends. Lead paint is presumed present; related work requires certified personnel.
Schedule: Start on or after November 6, 2026, subject to permit issuance; substantial completion by January 8, 2027, and final completion by January 15, 2027.