We're requesting a budgetary quote for distributed antenna system (DAS) operations, maintenance, and modernization at Virginia Tech in Blacksburg, Virginia 24061.
Due
December 1, 2026
12 days left
Location
Vermont
Posted on
JAGGAER
Notice ID
351512703
Please quote operations, maintenance, and modernization of the distributed antenna system (DAS) at Lane Stadium and six residence halls (Miles, Pritchard, Ambler Johnston, New Hall West, Cochrane, and Harper) at Virginia Tech in Blacksburg, Virginia 24061, with Cassell Coliseum expansion priced separately as an option.
System: Multi-carrier neutral-host DAS supporting AT&T, T-Mobile, and Verizon, including 4G/5G and C-Band expansion for AT&T and Verizon.
Performance: Target of 25 Mbps upload and download per user for stadium attendance of 66,000 to 75,000.
Schedule: Increase Lane Stadium node capacity by July 23, 2027, with full replacement operational by August 2027.
Operations: Preventive and corrective maintenance, RF optimization, monitoring, reporting, and on-site support for about 10 games plus concerts, including preparation 1 to 2 days before events.
Term: 10-year term for annual operating fees.
Please confirm availability and send your quote by December 1, 2026.
The original documents
Deadline: December 1, 2026
See the original on app01.jaggaer.com
Bidding it yourself? Get the full package and submit on JAGGAER before December 1, 2026.
What they need
LocationsLane Stadium and six residence halls: Miles, Pritchard, Ambler Johnston, New Hall West, Cochrane, and Harper. Price Cassell Coliseum expansion separately as an option.
SystemMulti-carrier neutral-host DAS supporting AT&T, T-Mobile, and Verizon, including 4G/5G and C-Band expansion for AT&T and Verizon.
ModernizationInclude RF design, equipment replacement, head-end upgrades, fiber/backhaul improvements, monitoring tools, and performance testing. Target 25 Mbps upload and download per user for stadium attendance of 66,000–75,000.
ScheduleIncrease Lane Stadium node capacity by July 23, 2027, with full replacement operational by August 2027.
OperationsInclude preventive and corrective maintenance, RF optimization, monitoring, reporting, and on-site support for approximately 10 games plus concerts, including preparation 1–2 days before events.
PricingProvide estimated capital costs, annual operating fees for a 10-year term, and proposed carrier funding and revenue sharing. Detailed inventories are unavailable; state assumptions used for your estimate.