This bid is for forestry mulching at Miller Meadows in Beaver County, approximately 30 miles west of Minersville, Utah.
Due
November 17, 2026
9 days left
Location
Minersville, UT
Utah
Posted on
Bonfire
Notice ID
NC27-128
Please quote forestry mulching of approximately 741 acres at Miller Meadows in Beaver County, approximately 30 miles west of Minersville, Utah.
Treatment: Mulch all live and dead pinyon and juniper trees and saplings across two areas except designated trees to keep; hand-cut material machinery cannot remove.
Equipment: Supply at least two working Bullhogs with qualified operators, capable of mulching trees up to 28 inches in diameter measured 12 inches above ground on the uphill side.
Finish: Leave stumps no higher than 6 inches on the uphill side, no limbs on stumps, cut material no longer than 3 feet, and mulch no deeper than 6 inches.
Site: Elevation is 6,000–6,650 feet, with access by dirt roads and jeep trails; GPS equipment is required to locate unmarked treatment boundaries.
Ground conditions: No mulching on snow, frozen ground, or soil with more than 15% moisture.
Schedule: Begin within seven calendar days of authorization and finish by March 15, 2027.
Please confirm availability and send your quote by November 17, 2026.
The original documents
Deadline: November 17, 2026
See the original on utah.bonfirehub.com
Bidding it yourself? Get the full package and submit on Bonfire before November 17, 2026.
What they need
ScopeTreat approximately 741 acres across two units, mulching all live and dead pinyon and juniper trees and saplings except designated leave trees. Hand-cut material machinery cannot remove.
EquipmentSupply at least two operational Bullhogs with qualified operators, capable of mulching trees up to 28 inches in diameter measured 12 inches above ground on the uphill side.
FinishMaximum stump height of 6 inches on the uphill side, no remaining stump limbs, slash lengths no greater than 3 feet, and mulch depth no greater than 6 inches.
Site conditionsElevation 6,000–6,650 feet; access via dirt roads and jeep trails. GPS equipment is required to locate unflagged treatment boundaries. No mulching on snow, frozen ground, or soil exceeding 15% moisture.
ScheduleBegin within seven calendar days of authorization and finish by March 15, 2027.
PricingProvide a per-acre rate and total for 741 acres, including labor, equipment, supervision, transportation, mobilization, operating supplies, equipment washing before entry and exit, and two 3-by-3-foot warning signs.