This bid is for network equipment and fiber cabling for Windsor Southeast Supervisory Union at these Vermont locations: 19 Ascutney St, Windsor, VT 05089; 135 School House Road, Ascutney, VT 05030; 97 Martinsville Road, Hartland, VT 05048; 108 Hartland/Brownsville Road, Brownsville, VT 05037; and 54
Due
January 7, 2027
40 days left
Location
Texas
Posted on
Bonfire
Notice ID
270005099
Please quote network equipment and fiber cabling, including wireless access points, switch and access point subscriptions, a rack, power equipment, and installed fiber, for Windsor Southeast Supervisory Union schools at 19 Ascutney St, Windsor; 135 School House Road, Ascutney; 97 Martinsville Road, Hartland; 108 Hartland/Brownsville Road, Brownsville; and 54 Main Street, Windsor, Vermont.
Access points: Aruba or equivalent: 135 AP-725 (Wi-Fi 7, tri-radio 2x2, 2.5GbE), 18 AP-735 (Wi-Fi 7, tri-radio 2x2, 5GbE, high density), and 15 AP-765 outdoor units.
Subscriptions: Three-year Foundation subscriptions for 22 switches and 168 access points.
Rack: One StarTech 4POSTRACK18U 4-post 18U mobile open-frame rack or equivalent.
Power: Eaton or equivalent: two 9PX6K-L 6000VA 208V lithium-ion UPS units, four 9PXEBM192RT-L battery modules, one PDUMH20HVATNET switched ATS PDU, two PDUMV20HVNETLX 3.7kW switched PDUs, and nineteen 5PX1500RTNG2 1440VA 120V 2U UPS units with network cards.
Fiber: About 3,319 feet of armored OS2 single-mode, riser-rated fiber with LC terminations across four school buildings.
Strand count: Scope says 12-strand runs and one 24-strand trunk from Closet C to IDFs E, F, and G, patched through at E, but the pricing sheet lists 48-strand fiber. State your assumption and price the alternative separately.
Please confirm availability and send your quote by January 7, 2027.
The original documents
Deadline: January 7, 2027
See the original on kelloggllc.bonfirehub.com
Bidding it yourself? Get the full package and submit on Bonfire before January 7, 2027.
What they need
Wireless access pointsAruba or equivalent: 135 AP-725 (Wi-Fi 7, tri-radio 2x2, 2.5GbE), 18 AP-735 (Wi-Fi 7, tri-radio 2x2, 5GbE, high density), and 15 AP-765 outdoor units.
SubscriptionsThree-year Foundation subscriptions for 22 switches and 168 access points.
RackOne StarTech 4POSTRACK18U 4-post 18U mobile open-frame rack or equivalent.
Power equipmentEaton or equivalent: two 9PX6K-L 6000VA 208V lithium-ion UPS units; four 9PXEBM192RT-L battery modules; one PDUMH20HVATNET switched ATS PDU; two PDUMV20HVNETLX 3.7kW switched PDUs; and nineteen 5PX1500RTNG2 1440VA 120V 2U UPS units with network cards.
Fiber cablingApproximately 3,319 feet of armored OS2 single-mode, riser-rated fiber with LC terminations across four school buildings. Scope specifies 12-strand runs and one 24-strand trunk from Closet C to IDFs E, F, and G, patched through at E; the pricing sheet lists 48-strand fiber. Please identify your strand-count assumption and price the alternative separately.
InstallationInclude installation, initial configuration, termination, labeling, and certification of all new fiber strands. Installation services apply only to cabling.
PricingProvide itemized equipment, licenses, accessories, manufacturer support/warranty, labor, shipping, and taxes. Show an estimated 25% tariff on networking equipment manufactured abroad as a separate line item.