This bid is for data center relocation and physical colocation hosting for a project based at 700 Governors Dr, Pierre, SD 57501, with hosting at your proposed facility in the continental United States.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 2, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Migration: Planning, specialized equipment handling, transport, rack installation, staged cutovers, and validation for enterprise servers, mainframes, storage, backup appliances, and networking equipment.
Hosting: Scalable rack/cage space for mixed hardware and high-density loads; 99.999% availability SLA; redundant power feeds, UPS, generators, cooling, and fire suppression. Power must originate entirely within the United States.
Connectivity: Diverse carrier pathways, separated fiber and copper routes, structured cabling, and cross-connect options.
Security: 24/7 controlled access, multifactor entry, mantraps, and CCTV with 180-day retention; NIST SP 800-53 Rev. 5 alignment and applicable HIPAA, IRS Pub 1075, PCI DSS, and CJIS controls. Provide SOC 2 Type II, ISO 27001, PCI DSS, and GovRAMP evidence.
Support: Critical remote hands within one hour, routine requests the same day, environmental/security alerts within 15 minutes, and annually tested continuity and disaster recovery plans.
Pricing: Itemize migration/setup, space, power, connectivity, support, and exit fees; include a three-year operating cost projection and optional service rates for a 10-year term with two optional one-year extensions.