This bid is for architectural and engineering services for powerhouse and related facility improvements at Oakwood Correctional, 2338 N. West Street, Lima, Ohio.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Ohio bid is posted.
What the job is
Services: Architecture-led design with electrical and plumbing engineering, existing-condition verification, construction documents, bidding support, construction administration, and closeout.
Electrical: Design replacement panels, switchgear, feeds, transformers, and generators serving the powerhouse, warehouse, farm, outbuildings, and Allen E-Building.
Building improvements: Design powerhouse boiler replacement, unused equipment removal, commercial windows and doors with hardware, masonry repairs, barn roof repairs, and farm building demolition.
Fuel systems: Plan underground tank removal at the powerhouse and former Lima Correctional Institution, investigate potential soil contamination and hazardous materials, and verify capacity for a new aboveground diesel tank near the garage.
Construction support: Include at least three on-site hours weekly during construction, excluding travel, with progress meetings and written field reports.
Budget and schedule: $4.34 million construction budget; services anticipated March 2027–June 2029, with construction February 2028–February 2029. Verify and prioritize scope within budget.