This bid is for renovation design consulting for Roosevelt Hall at Binghamton University, 4400 Vestal Parkway East, Vestal, NY.
Due
November 19, 2026
3 days left
Location
Vestal, NY
New York
Posted on
nyscr.ny.gov
Notice ID
CR2140342
Please quote renovation design consulting for the Level 3 alteration of Roosevelt Hall, a 44,034-square-foot dormitory at Binghamton University, 4400 Vestal Parkway East, Vestal, NY.
Building: 44,034-square-foot dormitory with 100 bedrooms, 38 bathrooms, a new kitchen, and a laundry room.
Asbestos survey: Entire building and roof, including concealed and mechanical spaces, with a certified survey team, sampling, lab analysis, and a PDF of findings with quantities and sample locations.
Engineering: Structural analysis of alterations, plus plumbing design and a full fire protection retrofit.
Door hardware: Selection, specifications, coordination, and submittal review covering campus standards, accessibility, and life safety.
Cost and energy: Project estimates at 30%, 60%, and 90% design, plus energy code compliance and energy and carbon reduction guidance.
Schedule: Coordinate with the campus design team and support construction through completion; design done by August 27, 2027, construction planned May 17, 2028 to June 1, 2029.
Please confirm availability and send your quote by November 19, 2026.
The original documents
Deadline: November 19, 2026
See the original on www.nyscr.ny.gov
Bidding it yourself? Get the full package and submit on nyscr.ny.gov before November 19, 2026.
What they need
ProjectLevel 3 alteration of a 44,034-square-foot dormitory with 100 bedrooms, 38 bathrooms, a new kitchen, and a laundry room.
Asbestos surveyEntire building and roof, including concealed and mechanical spaces; certified survey team, sampling, laboratory analysis, and PDF findings with quantities and sample locations.
StructuralAnalyze alterations affecting building loads, slab cuts, penetrations, foundations, and new enclosures.
Plumbing and fire protectionDesign fixture, water heater, water and sanitary piping upgrades, and a full fire protection retrofit.
Door hardwareSelection, specifications, coordination, and submittal review addressing campus standards, accessibility, and life safety.
Cost and energy consultingComprehensive project estimates at 30%, 60%, and 90% design; energy code compliance and energy/carbon reduction guidance.
Coordination and scheduleCoordinate with the campus design team and support construction through completion; design completion August 27, 2027, with construction planned May 17, 2028–June 1, 2029.
Past history: who won Construction & Renovation work in New York
Recent federal contract awards (federal buyers) in the same industry in New York, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$200K to $5.5Mmiddle half of 15 recent awards · median $1M