Scope: Provide labor, parts, materials, and equipment for preventive maintenance, inspections, testing, and repairs over 1,095 days.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar New York bid is posted.
What the job is
Brooklyn systems: Wet, dry, and pre-action sprinklers with 1,119 heads; standpipe; fire pump; and Siemens FC922 fire alarm system with 185 devices.
Staten Island systems: Wet sprinklers with 26 heads and Siemens FC901 fire alarm system with 32 devices.
Scheduled service: Monthly fire pump inspections; quarterly sprinkler and standpipe inspections; annual maintenance and dry-system winterization; semiannual and annual fire alarm testing; and specified three- and five-year testing.
Repairs: As-needed service with a 24-hour response requirement. Central station monitoring is excluded.