The original documents
Deadline: November 17, 2026
See the original on nevada.ionwave.net
Bidding it yourself? Get the full package and submit on Ionwave before November 17, 2026.
What they need
- Video wallsUpgrade multiple video walls managed through one control system, using multiple displays, segmented large screens, or a combination.
- Backend equipmentUpgrade IDF room equipment and identify requirements for future displays and A/V endpoints.
- Dedicated networkSupply, install, configure, and maintain physically separate video network hardware, including switches and PoE equipment, with restricted management access and documented ports and protocols.
- CablingMeet Division 27 requirements, including CommScope structured cabling, certified installation, an RCDD project manager, testing, labeling, as-built documentation, and a 25-year system warranty. A qualified cabling subcontractor may be used.
- Quote detailsInclude equipment, labor, installation, permits, travel, warranty/support, implementation schedule, anticipated downtime, power requirements, and any assumptions about quantities or existing conditions.
Get new Nevada bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More Nevada bids → · All states →