We’re requesting a budgetary quote for energy efficiency and waste reduction improvements at food and beverage manufacturing or organic waste processing facilities in Minnesota, United States. A specific facility address and equipment scope have not yet been provided.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before January 4, 2027.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Work: Supply and installation of equipment or process upgrades that reduce energy use, greenhouse gas emissions, or food system waste. Please identify the improvements your team can provide.
Assessment: Baseline energy assessment or greenhouse gas inventory before installation, plus at least three months of post-installation measurement and verification.
Schedule: Equipment installed, operational, and commissioned by June 30, 2029; verification and final reporting completed by September 30, 2029.
Pricing: Itemize equipment, materials, delivery, installation, commissioning, and assessment or verification services, with quantities, unit costs, lead times, and assumptions.
The basics
Due
January 4, 2027 78 days left
Where
Minnesota
Posted on
guest.supplier.systems.state.mn.us
Solicitation
R3201-2000018798
What the solicitation documents require
We read the solicitation documents for this bid (19 documents, 246 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Due date and time
Bidding closes at the event End Date and time shown on the View Events and Place Bids page in the Supplier Portal; suppliers can bid up to that date and time. (Verify Event Due Date, p. 1)
Where a Price Schedule is attached, download it, update the pricing information, and upload the completed file(s) as part of the bid response. (Respond to a Price Schedule, p. 1)