This bid is for concrete removal and waste disposal at 2050 135th Avenue, Hopkins, Allegan County, Michigan, directly south of Hilliards General Store.
Due
January 6, 2027
42 days left
Location
Allegan County, MI
Michigan
Posted on
sigma.michigan.gov
Notice ID
761/23493.IND
Please quote concrete removal, waste drum disposal, and site restoration at 2050 135th Avenue, Hopkins, Allegan County, Michigan, directly south of Hilliards General Store.
Concrete: Excavate and haul away debris from a former 1,700-square-foot concrete slab, including remaining foundations and footings.
Disposal: Characterize, recycle or dispose of the concrete, and clean oil-stained concrete where needed.
Drums: Characterize, transport, and dispose of five nonhazardous 55-gallon steel drums: two of soil and three of water, with testing, waste profiles, licensed disposal, and manifests.
Restoration: Mobilization, utility clearance, backfill, compaction, grading, 4 inches of topsoil, seed, fertilizer, and mulch.
Safety: Petroleum contamination is present; include HAZWOPER-qualified personnel, site safety planning, and equipment decontamination.
Schedule: Anticipated spring 2027 start, finished within 60 days, coordinated around farming operations.
Please confirm availability and send your quote by January 6, 2027.
The original documents
Deadline: January 6, 2027
See the original on sigma.michigan.gov
Bidding it yourself? Get the full package and submit on sigma.michigan.gov before January 6, 2027.
What they need
Concrete removalExcavate and haul away debris from a former 1,700-square-foot concrete slab, including remaining foundations and footings. Include characterization, recycling or disposal, and cleaning of oil-stained concrete where needed.
Waste drumsCharacterize, transport, and dispose of five nonhazardous 55-gallon steel drums containing soil (2) and water (3), including testing, waste profiles, licensed disposal, and manifests.
Site restorationInclude mobilization, utility clearance, backfill, compaction, grading, 4 inches of topsoil, seed, fertilizer, and mulch.
Site conditionsPetroleum contamination is present; include HAZWOPER-qualified personnel, site safety planning, and equipment decontamination.
ScheduleAnticipated spring 2027 start with completion within 60 days, coordinated around farming operations.
Other recent awards in this industry in Michigan
Recent federal contract awards (federal buyers) in the same industry in Michigan, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
Who won
Amount
Buyer
Date
Jgj Dirt LLCOTF-CON SRS2 courtney lake toilet buildings replacement