This bid is for Phase I design of the PATH Lakewood paved shared-use trail, from the Southside Beltline Trail to Pryor Road at Meldon Avenue in Atlanta, Fulton County, Georgia.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Georgia bid is posted.
What the job is
Design: Validate and update the existing concept report; prepare preliminary and final design plans, right-of-way plans, and construction documents.
Engineering: Include traffic analysis, drainage, utilities, signing and markings, traffic signals, erosion control, and accessible pedestrian and bicycle facilities.
Environmental: Prepare NEPA documentation and supporting studies, including revisions needed for approvals and permits.
Coordination: Include public and stakeholder engagement and updated cost estimates at each design phase.