Fill removal: Excavate approximately 5,522 cubic yards across 37,271 square feet to natural wetland elevations; load directly into trucks and haul to Carysfort Basin within Pennekamp State Park in North Key Largo.
Due
December 29, 2026
46 days left
Location
Florida
Posted on
Bonfire
Notice ID
RFP-656
Please quote habitat restoration, including fill removal, boulder work and dock demolition, at Block 4, Lots 1–8, Hibiscus Park, east end of Hibiscus Lane near US Hwy 1 mile marker 101, Key Largo, Monroe County, Florida 33037.
Fill removal: Excavate about 5,522 cubic yards across 37,271 square feet to natural wetland elevations, load directly into trucks and haul to Carysfort Basin in Pennekamp State Park, North Key Largo.
Boulders: Remove about 252 cubic yards of existing revetment, install about 39 cubic yards of 24-inch boulders with filter fabric along 263 linear feet, and neatly stockpile surplus boulders on site.
Dock: Remove and dispose of the entire wood dock, about 90 square feet, including underwater portions.
Site protection: Include required permitting, silt fencing, turbidity curtains, erosion controls, and protection of existing wetlands and native vegetation, using land-based equipment only.
Schedule: Finish by June 1, 2027; work Monday to Friday, 8 am to 5 pm, excluding holidays.
Site meeting: Mandatory site meeting December 2, 2026 at 10 am at the east end of Hibiscus Lane.
Please confirm availability and send your quote by December 29, 2026.
The original documents
Deadline: December 29, 2026
See the original on monroecounty-fl.bonfirehub.com
Bidding it yourself? Get the full package and submit on Bonfire before December 29, 2026.
What they need
Boulder workRemove approximately 252 cubic yards of existing revetment; install approximately 39 cubic yards of 24-inch boulders with filter fabric along 263 linear feet. Neatly stockpile surplus boulders on site.
Dock demolitionRemove and dispose of the entire approximately 90-square-foot wood dock, including underwater portions.
Site protectionInclude required permitting, silt fencing, turbidity curtains, erosion controls, and protection of existing wetlands and native vegetation. Use land-based equipment only.
ScheduleComplete by June 1, 2027; work Monday–Friday, 8 am–5 pm, excluding holidays. Mandatory site meeting: December 2, 2026, at 10 am at the east end of Hibiscus Lane.
Past history: who won Construction & Renovation work in Florida
Recent federal contract awards (federal buyers) in the same industry in Florida, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$1,000 to $939Kmiddle half of 15 recent awards · median $1,000