XL Eagle Send us your price
Connecticut bid · closed

Siding, Windows, Doors, Trim and Painting

This bid is for exterior renovations at Sharon Homes Apartments, 91, 93, and 95 North Main Street, Sharon, CT 06069: three occupied, two-story buildings with six apartments.

Closed
October 30, 2026
Closed
Location
Sharon, CT
Connecticut
Posted on
webprocure.proactiscloud.com

The original documents

Deadline: October 30, 2026

See the original on webprocure.proactiscloud.com

Bidding it yourself? Get the full package and submit on webprocure.proactiscloud.com.

What they need

  • WindowsReplace approximately 85 windows, including 12 basement units, with full-frame, new-construction-style units. Use Andersen E-Series or 500 Series on street-facing elevations and 100 Series elsewhere, per schedule. Include a $75,000 window purchase and freight allowance, plus installation, flashing, insulation, interior trim, painting, and drywall repairs. Field-verify sizes.
  • DoorsReplace six apartment entry doors with prehung, insulated fiberglass 4-panel Shaker doors, composite frames, Grade 2 locksets, and deadbolts. Replace the basement door at 95 with an insulated galvanized steel door and frame, approximately 3 feet by 4 feet. Include flashing, trim, and painting.
  • Siding and trimRemove existing vinyl siding, fanfold, and painted metal wrap; retain cedar shingles. Install HydroGap or approved equal weather barrier, minimum 3/8-inch fanfold, CertainTeed MainStreet Double 4-inch siding, 3-1/2-inch vinyl window/door casing, and aluminum wrap at fascia, rake, porch posts, and beams.
  • Porches and modificationsRemove porch screens and screen doors; replace lattice/skirting with PVC or composite; reside solid porch walls. Include modifications A–F at 93 North Main Street per drawings, including new porch entry steps.
  • Optional pricingSeparately price replacement front steps, landings, and railings at 91 and 95 using composite decking and composite/PVC railings; and replacement of the Bilco door and areaway foundation at 93.
  • Pricing conditionsInclude labor, materials, permits, access equipment, protection, cleanup, and disposal; exclude sales/use tax. Include lead-safe renovation practices and coordination with separate hazardous-material abatement. Exclude regulated abatement and concealed rot/sheathing/framing repairs; provide hourly repair rates and material markup.
  • Site walk and qualificationsMandatory walkthrough October 20, 2026, at 10:00 a.m. Connecticut HIC license, lead-safe firm certification, workers' compensation, and $1 million general liability coverage required.

Past history: who won Construction & Renovation work in Connecticut

Recent federal contract awards (federal buyers) in the same industry in Connecticut, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.

Typical award: $147K to $6.8Mmiddle half of 15 recent awards · median $988K
Who wonAmountBuyerDate
Excell Construction CorpTo award repair survival pool billard hall at the u.s. coast guard academy in the amount of $3,324,085.63. $3,324,086U.S. Coast GuardOct 2026
Seneca Strategic Partners, LLCReplacement of fire alarm systems at multiple BOP facilities project 26Z7AK3. EO 14398 $988,129Federal Prison System / Bureau of PrisonsOct 2026
Excell Construction CorpEquipment, materials, labor and supervision, necessary to repair the chase A-B connector bridge at the US coas… $673,234U.S. Coast GuardSep 2026
Healtheon, INCDesign-build construction project for the reconfiguration and repair of waesche hall. $29,364,070U.S. Coast GuardSep 2026
Henry General Contractors INCOrder IS awarded to henry construction LLC in the amount of 115,957.00 for the jury & deliberation room ceilin… $115,957Public Buildings ServiceSep 2026
Tara-Campbell JV LLPTask order award for replace exterior stairs chase hall at the u.s. coast guard academy, NEW london, CT, PSN 3… $1,697,341U.S. Coast GuardAug 2026
Tara-Campbell JV LLPMajor repairs quarters 4/5 at the u.s. coast guard academy, NEW london, CT (new london county), project NO. 18… $3,792,215U.S. Coast GuardAug 2026
Whiting-Turner Contracting Company, theAccelerated design-build to budget for chase hall mid-life renovations, annex a west wing PH vii, US coast gua… $51,000,000U.S. Coast GuardAug 2026

Losing bids are not made public on most government buys, so only the winner and price are shown.

Similar open bids

Get new Connecticut bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Connecticut bids → · Construction & Renovation bids in Connecticut → · Environmental Services bids in Connecticut → · Transportation & Hauling bids in Connecticut → · Painting & Coatings bids in Connecticut → · All states →