Lockout/Tagout Program Assessment and Implementation
This bid is for lockout/tagout program assessment and implementation at Water Reclamation Facility 2, 650 E. Harrison St., Corona, CA 92879.
Due
November 23, 2026
7 days left
Location
Corona, CA
California
Posted on
vendors.planetbids.com
Notice ID
27-004MB
Please quote a lockout/tagout program assessment and implementation for Water Reclamation Facility 2, 650 E. Harrison St., Corona, CA 92879.
Assessment: Survey about 260 listed equipment items, inventory hazardous energy sources, and photograph equipment and isolation points.
Procedures: Write equipment-specific energy control procedures with shutdown, isolation, stored-energy release, and re-energization steps, with photos and diagrams, meeting OSHA 29 CFR 1910.147.
Arc flash: Check existing evaluations and perform evaluations where none have been done.
Validation: Field-test procedures with operations and maintenance staff.
Training: Train authorized and affected employees.
Deliverables: Accessible documentation plus an SOP for developing future procedures; finish within 8 to 10 months of authorization to begin.
Please confirm availability and send your quote by November 23, 2026.
The original documents
Deadline: November 23, 2026
See the original on vendors.planetbids.com
Bidding it yourself? Get the full package and submit on vendors.planetbids.com before November 23, 2026.
What they need
AssessmentSurvey approximately 260 listed equipment items, inventory hazardous energy sources, and photograph equipment and isolation points.
ProceduresDevelop equipment-specific energy control procedures with shutdown, isolation, stored-energy release, and re-energization steps, including photos and diagrams, compliant with OSHA 29 CFR 1910.147.
Arc flashVerify existing evaluations and perform evaluations where none have been completed.
Validation and trainingField-test procedures with operations and maintenance staff, provide authorized and affected employee training, and deliver accessible documentation plus an SOP for developing future procedures.
Schedule and pricingComplete within 8–10 months of authorization to begin. Provide a fixed total fee with hours and rates by task, plus a unit price per additional equipment procedure.