Wastewater Flow Monitoring Equipment, Software and Services
This bid is for wastewater flow monitoring equipment, software, and maintenance at approximately 163 sites throughout southwestern San Diego County, California.
Due
December 4, 2026
18 days left
Location
San Diego County, CA
California
Posted on
vendors.planetbids.com
Notice ID
10090521-27-B
Please quote wastewater flow monitoring equipment, software, installation and ongoing maintenance for approximately 163 sites throughout southwestern San Diego County, California.
Equipment: Area-velocity meters, depth sensors, telemetry, batteries and replacement parts, supplied and installed. Depth accuracy ±1%, velocity accuracy ±2%, pipes up to 114 inches, surcharge measurement up to 30 feet.
Software: Cloud-based data access, analysis and reporting, with real-time high-level and low-flow alerts within one hour. Includes integration, perpetual licensing and upgrades.
Services: Installation, calibration, preventive maintenance, repairs, a permanent local crew, locally stocked parts and 24-hour support, with at least 95% uptime.
Additional sites: Up to 25 new permanent meters initially and five per year after that, plus yearly relocation of eight existing and up to 10 new temporary monitors.
Site conditions: Manholes 3 to 30 feet deep, with confined-space work, restricted-site access and traffic control for at least one-third of sites.
Term: Four years, with four optional annual renewals.
Please confirm availability and send your quote by December 4, 2026.
The original documents
Deadline: December 4, 2026
See the original on vendors.planetbids.com
Bidding it yourself? Get the full package and submit on vendors.planetbids.com before December 4, 2026.
What they need
EquipmentSupply and install area-velocity meters, depth sensors, telemetry, batteries, and replacement parts. Depth accuracy ±1%, velocity accuracy ±2%, pipe diameters up to 114 inches, and surcharge measurement up to 30 feet.
Software and alarmsProvide cloud-based data access, analysis, reporting, and real-time high-level and low-flow alerts within one hour; include integration, perpetual software licensing, and upgrades.
Field servicesInclude installation, calibration, preventive maintenance, repairs, a permanent local crew, locally stocked parts, and 24-hour support. Maintain at least 95% uptime.
Additional sitesAllow for up to 25 new permanent meters initially and five annually thereafter, plus maintenance and annual relocation of eight existing and up to 10 new temporary monitors.
Site conditionsManholes range from 3–30 feet deep. Include confined-space work, restricted-site access, and traffic control for at least one-third of sites.
PricingSeparate equipment, installation, software implementation, and ongoing monthly support for a four-year term with four optional annual renewals. Include labor, materials, training, and five-year equipment and installation warranties.
Past history: who won Maintenance & Repair work in California
Recent federal contract awards (federal buyers) in the same industry in California, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$26K to $135Kmiddle half of 15 recent awards · median $60K
Who won
Amount
Buyer
Date
Surfacide, LLCPreventive maintenance surfacide uv-c disinfection systems
$59,985
Department of Veterans Affairs
Dec 2026
Illumina, INC.Niaaa: service agreement: catalog SV1212001 for illumina product care liha 1 preventative maintenance plan - p…