Site: 169,372 sq. ft. of landscaped areas plus 45,793 sq. ft. above V ditches, approximately 330 trees, and 1,731 linear ft. of drainage ditches; includes steep slopes requiring handwork.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before December 3, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Staffing: At least three crew members for eight hours each weekly, plus two additional crew members for two eight-hour visits per quarter.
Landscape care: Weekly weed, litter, and animal waste removal; turf care; quarterly shrub pruning and above-ditch maintenance; tree trimming maintaining 6 ft. 6 in. pedestrian and 13 ft. roadway clearance; twice-yearly open-area clearing and fertilization.
Irrigation: Maintain six Calsense CS3000 controllers and associated systems, with weekly alert checks, monthly testing, programming, and minor repairs up to $500.
Cleaning: Clean V ditches weekly in fall/winter and monthly in spring/summer, with post-storm inspections; maintain walkways, one bus shelter, one trash can, and five dog waste stations, including bag refills.
Coordination: Monthly and quarterly maintenance reports and monthly one-hour virtual meetings.
Site visit: Mandatory November 5, 2026, at 10:00 a.m., at Barnrock Drive and Hayward Boulevard, Hayward, California.
Pricing: Provide an all-inclusive annual price, weekly labor hours, and hourly rates for irrigation, tree work, general labor, and pesticide application. Include all labor, materials, equipment, transportation, and disposal.