The original documents
Deadline: November 24, 2026
See the original on caleprocure.ca.gov
Bidding it yourself? Get the full package and submit on Cal eProcure before November 24, 2026.
What they need
- RelocationVerify operational status, power down, disconnect, de-rack, package, transport, and re-rack all equipment.
- ReinstallationDocument and label peripheral and equipment interconnect cables; reconnect power, peripherals, and prepared, labeled LAN/fiber connections; power on and run Power-On Self-Test (POST). Customer provides and runs external network/fiber cabling.
- CoordinationProvide a dedicated project manager.
- Schedule and pricingWork window is December 1, 2026, through January 31, 2027. Include all travel costs in the quote; a California office is required throughout the work period.
Get new California bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More California bids → · All states →