The government needs groundwater and surface water sampling, lab testing, and reporting for the Grand Encampment Dredge Material Placement Site Unload project at the Zumbro River near Kellogg, in Wabasha County, MN.
Please quote groundwater monitoring and sampling services, with lab testing and a final report, for the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, Wabasha County, Minnesota.
Sampling: Water samples from three monitoring wells and up to four government-selected residential wells before, during and after the site unloading in Spring 2027.
Extra samples: During active unloading, also sample the river upstream of the site and standing water in the dredged-material placement/infiltration pit.
Lab: Testing by a laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters.
Schedule: Before placement at about 90, 60 and 30 days prior; during placement at about 3, 17 and 31 days after transfer starts; after placement at about 30, 60 and 90 days after transfer ends.
Options: Optional extra sampling and testing at about 45, 59 and 73 days after transfer starts.
Report: Final sampling and analysis report due within 50 days of testing completion.
Please confirm availability and send your quote by November 18, 2026.
The original documents
Deadline: November 18, 2026
See the original on sam.gov
Bidding it yourself? Search notice W912ES27QA013 on SAM.gov and submit before November 18, 2026. You need an active SAM.gov registration.
What they need
Sampling scopeCollect water samples from three monitoring wells and up to four government-selected residential wells, plus river water upstream of the site and standing water in the placement/infiltration pit during active unloading.
Sampling scheduleSample about 90, 60 and 30 days before transfer starts, about 3, 17 and 31 days after it starts (with options at about 45, 59 and 73 days), and about 30, 60 and 90 days after it ends.
Lab accreditationSamples must be analyzed by an environmental lab accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters.
Period of performanceActive unloading of the site is planned for Spring 2027, and sampling runs before, during and after that work.
Final reportSubmit a final sampling and analysis report within 50 days of finishing testing.
Set-aside and submissionThis is a 100% small business set-aside under NAICS 541380 ($19 million size standard); submit offers and written questions through the PIEE module.
Other recent awards in this industry across the US
Recent federal contract awards in the same industry across the US, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.