Free Subcontractor Quote Template for Government Jobs

A prime contractor can only bid your work if your price is clear, complete and easy to drop into their offer. This free template gives you the fields a prime needs on a government job, and the guide below shows how to fill them in so your quote is not the one that gets set aside.

1. Download the quote template (printable HTML + CSV)

Two versions, same fields. Print the HTML version (or save it as a PDF from the print dialog) if you fill quotes by hand. Use the CSV if you work in Excel or Google Sheets.

Download CSV

2. Preview: line items, unit price, quantity, lead time, exclusions, validity date

Subcontractor quote

Company nameSolicitation number
Contact nameQuote date
Phone / emailValid until
UEI (if you have one)Place of performance
LineDescriptionUnitQtyUnit priceExtendedLead time
1
2
3
4
Total
Exclusions
Assumptions
Wage determination used
Payment terms
Signed by / date

What each field is for

  • Line items: match the buyer's own price schedule (the CLINs, or contract line items, in the solicitation). If the buyer lists 4 lines, quote 4 lines in the same order.
  • Unit and quantity: use the buyer's units (each, month, square foot, visit). A price per month cannot be compared with a price per visit.
  • Unit price and extended price: extended = unit price × quantity. Check the math; a wrong total makes the whole quote suspect.
  • Lead time: how soon after award you can start or deliver. Compare it with the dates in the solicitation.
  • Exclusions: what you are not pricing (permits, disposal fees, after-hours work). Be specific so nothing is assumed.
  • Validity date: the last day your price holds. More on this in the FAQ.

3. How to price a government job as a sub

Build the number from the bottom up, then check it against the scope one more time.

How a subcontractor quote adds up: labor, materials and equipment, travel, overhead and profit equal your quoteLaborHours x loaded rate, at least the wage determination+Materials and equipmentCurrent supplier quotes, delivery, rentals, disposal+TravelTrips, miles, lodging and meals+OverheadOffice, vehicles, software, insurance+ProfitYour margin on the job=Your quote to the primeThe prime adds its own costs on top when it bids
Build your price from the bottom up: each cost layer adds to the total you quote.

Labor

Count the hours per task, by worker type, for the whole period of performance. Multiply by your loaded rate: wages plus payroll taxes, workers' comp, insurance and paid leave.

Wage determinations (Davis-Bacon and Service Contract Act)

Many federal jobs come with a minimum wage floor you must pay. The Davis-Bacon Act covers federal contracts over $2,000 for construction, alteration or repair of public buildings or public works (DOL: Davis-Bacon coverage). The Service Contract Act covers federal service contracts over $2,500, such as janitorial, grounds and guard work (DOL: Service Contract Act).

The rates for each job are in the wage determination attached to the solicitation. You can also look them up on SAM.gov, the official source for these determinations (sam.gov/content/wage-determinations). Find the classification for each worker (for example "Janitor" or "Electrician"), and price at least that hourly rate. Under the Service Contract Act, also add the required fringe benefits listed on the determination. These requirements flow down to subcontractors, so they apply to your crew too.

Materials and equipment

Use current supplier quotes, not last year's prices. Include delivery, rentals, fuel and waste disposal. If a price may change before award, say so in your assumptions.

Travel

Count trips, miles, and nights away if the site is far. If you build in lodging and meals, the federal per diem rates for that location are a useful benchmark (GSA per diem rates).

Overhead and profit

Add your share of office, vehicles, software and insurance, then your profit. Your quote is your price; the prime adds its own costs on top when it bids.

Trade-specific pricing tips are in our janitorial, construction and landscaping guides.

4. Bid/no-bid quick checklist before you quote

Answer these before you spend hours pricing. If you answer "no" to more than one or two, it may be a pass.

  • Is this work you already do, with the crew and equipment you have now?
  • Can you reach the place of performance on the schedule the job needs?
  • Have you read the full scope of work and every attachment, including the wage determination?
  • Can you meet the start date and the full period of performance?
  • Do you hold any licenses, certifications or insurance the solicitation names?
  • Can you carry your costs until payment arrives?
  • Is there enough time before the due date to price it properly and ask questions?

5. Common quote mistakes that get you dropped

  • Lump sum only. A single number with no line items cannot be mapped to the buyer's price schedule.
  • Wages below the wage determination. A price built on rates under the required minimum is a problem for everyone on the job.
  • Missing exclusions. If you don't say what is left out, the prime has to assume it is included.
  • Wrong units or quantities. Pricing 10 visits when the scope says 12, or per year when the schedule is per month.
  • No validity date, or one that expires before award.
  • Late. The prime needs time to build its offer before the buyer's deadline. Send your price early.
  • Changing the scope. Quote what was asked. Put alternatives in a separate, clearly labeled line.

6. Send your price on an open bid via XL Eagle

XL Eagle finds open federal, state and local bids and bids as the prime contractor. You send your price, and if we win, you do the work as our subcontractor at your price. There are no fees to bid, and we send nothing to the buyer without your OK.

Steps from your quote to the work: you price the job, send it to XL Eagle, XL Eagle bids as prime with your OK, and if it wins you do the work at your price1. You price the jobFill in the quote template2. Send your price to XL EagleNo fees to bid3. XL Eagle builds the bid as primeYour price plus the prime's own costs4. Bid goes to the government buyerNothing is sent without your OK5. If we winYou do the work as our subcontractor at your price
From your quote to the job: XL Eagle bids as the prime, and you do the work at your price if the bid wins.

Fill in the template, then search open bids or find contracts in your trade and send your price on the job you want. See how it works for the full steps.

Frequently asked questions

What should a subcontractor quote include?

Your company and contact details, the solicitation number, a line-item breakdown with unit, quantity, unit price and extended price, lead time, exclusions, assumptions, payment terms and a date the price is valid until.

How long should my quote stay valid?

At least as long as the prime's offer has to stay open. The solicitation states that acceptance period, so read it and set your validity date to match or exceed it.

Do Davis-Bacon and Service Contract Act wages apply to subcontractors?

Yes. When a federal contract is covered, the labor standards clauses flow down to subcontracts, so a subcontractor's workers must be paid at least the rates in the wage determination attached to the solicitation.

What is the difference between a quote and a bid?

A subcontractor quote is your price to the prime contractor for your part of the work. The bid is what the prime submits to the government buyer, which includes your price plus the prime's own costs and margin.

Does it cost anything to send XL Eagle a price?

No. There are no fees to bid. XL Eagle bids as the prime contractor and, if it wins, you do the work as the subcontractor at your price. Nothing is sent to the buyer without your OK.

Find open bids in your trade

XL Eagle bids as the prime; you subcontract at your price. No fees to bid.

Find open bids in your trade →   Browse contracts by trade and state

Updated November 25, 2026. This guide is general information, not legal advice. Check the solicitation and the official sources linked above for the rules on each job.