This bid is for geotechnical analysis and structural design for a permanent roadway slide repair at Davis Lake Road, milepost 1.67, Lewis County, Washington.
Due
November 13, 2026
1 day left
Location
Lewis County, WA
Washington
Posted on
OpenGov
Notice ID
CMP 2653
Please quote geotechnical analysis and structural design for a permanent roadway slide repair at Davis Lake Road, milepost 1.67, Lewis County, Washington.
Site investigation: Site visit, historical research, and at least two drilled borings, assumed up to 40 feet deep, sampled every 2.5 feet, with logs and compliant backfilling.
Repair options: Geotechnical report with geological cross section, three conceptual repair options, plan and profile sketches, earthwork recommendations, and construction cost estimates.
Design: Selected repair developed through 60%, 90%, and 100% plans, specifications, quantities, and cost estimates, plus a final geotechnical report and 11-by-17-inch drawings meeting applicable CADD standards.
Cultural resources: Survey with up to 30 shovel probes and draft and final reports meeting applicable cultural resource standards.
Term: About 18 months, with monthly meetings, progress schedules, and quality reviews.
Provided: Site topographic survey data and property access arrangements.
Please confirm availability and send your quote by November 13, 2026.
The original documents
Deadline: November 13, 2026
See the original on procurement.opengov.com
Bidding it yourself? Get the full package and submit on OpenGov before November 13, 2026.
What they need
Site investigationSite visit, historical research, and at least two drilled borings, assumed up to 40 feet deep, with sampling at 2.5-foot intervals, logs, and compliant backfilling.
Repair alternativesGeotechnical report with geological cross section, three conceptual repair options, plan/profile sketches, earthwork recommendations, and construction cost estimates.
Design deliverablesDevelop the selected geotechnical repair through 60%, 90%, and 100% plans, specifications, quantities, and cost estimates; include a final geotechnical report and 11-by-17-inch drawings meeting applicable CADD standards.
Cultural resourcesSurvey with up to 30 shovel probes and draft/final reports meeting applicable cultural resource standards.
Coordination and durationApproximately 18 months, including monthly meetings, progress schedules, and quality reviews. Site topographic survey data and property access arrangements will be provided.
Past history: who won Construction & Renovation work in Washington
Recent federal contract awards (federal buyers) in the same industry in Washington, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$46K to $233Kmiddle half of 15 recent awards · median $98K