XL Eagle Send us your price
Washington bid · open for prices

Ethernet or Fixed Wireless Services

This bid is for Ethernet wireline or fixed wireless services at three Washington locations: 11838 Tilley Road S., Olympia, WA 98512-9167; 220 North Walnut Street, Burlington, WA 98223-1138; and 9601 Steilacoom Blvd SW, Lakewood, WA 98498-7212.

Due
December 14, 2026
24 days left
Location
Olympia, WA
Washington
Posted on
pr-webs-vendor.des.wa.gov
Notice ID
27-RFQ-019

Please quote Ethernet wireline or fixed wireless internet service for three Washington locations: 11838 Tilley Road S., Olympia; 220 North Walnut Street, Burlington; and 9601 Steilacoom Blvd SW, Lakewood.

  • Olympia: 200 Mbps circuit, installed within 150 days, with handoff extended to the server closet and your Ethernet switch within 10 feet of customer equipment.
  • Burlington: 300 Mbps circuit, installed within 150 days, with handoff extended per site drawings and your Ethernet switch within 10 feet of customer equipment.
  • Lakewood: New 1 Gbps circuit, installed within 180 days (March 2027 completion preferred), with handoff extended to Server Room 130, Row 1, Rack 3.
  • Lakewood setup: Termination equipment within 10 feet of the customer router, duplex set to auto-negotiate, existing pathways used, and exterior equipment mounted no higher than six feet above ground.
  • Site work: Give advance notice for Olympia and Burlington visits, get approval before any ground disturbance, and provide installation drawings before work.
  • Included costs: Pricing covers all installation, equipment, cabling, permits and fees, excluding taxes.

Please confirm availability and send your quote by December 14, 2026.

The original documents

Deadline: December 14, 2026

See the original on pr-webs-vendor.des.wa.gov

Bidding it yourself? Get the full package and submit on pr-webs-vendor.des.wa.gov before December 14, 2026.

What they need

  • Olympia200 Mbps circuit with installation within 150 days; extended handoff to the server closet, with your Ethernet switch within 10 feet of customer equipment.
  • Burlington300 Mbps circuit with installation within 150 days; extended handoff per site drawings, with your Ethernet switch within 10 feet of customer equipment.
  • LakewoodNew 1 Gbps circuit with installation within 180 days; March 2027 completion preferred. Extend handoff to Server Room 130, Row 1, Rack 3, with termination equipment within 10 feet of the customer router and duplex set to auto-negotiate. Use existing pathways, provide installation drawings before work, and mount exterior equipment no higher than six feet above ground.
  • Site coordinationArrange advance notice for Olympia and Burlington visits and obtain approval before any ground disturbance. Follow site drawings for all handoffs.
  • PricingProvide monthly recurring and one-time charges per site, including all installation, equipment, cabling, permits, and fees, excluding taxes. Identify the local loop type, guaranteed installation interval, and at least one alternate bandwidth option with pricing per site.

Similar open bids

Get new Washington bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Washington bids → · All states →