XL Eagle Send us your price
Utah bid · open for prices

RTU and Split AC Replacement

Equipment: Remove and replace one rooftop unit and one cooling-only split AC system; integrate the rooftop unit with the existing building automation system using BACnet and Niagara 4 compatible controls.

Due
November 17, 2026
24 days left
Location
Utah
Posted on
Bonfire
Notice ID
CS27025

What they need

  • Roof workInstall a new equipment curb per project details. Roof modifications must be completed by the roof warranty holder with required Carlisle certification to preserve the warranty.
  • PlumbingInstall one freeze-proof, self-draining roof hydrant with a 1-inch inlet, integral backflow prevention, domestic water connection, and drain piping.
  • TestingInclude startup and independent testing, adjusting, and balancing by an AABC- or NEBB-certified firm.
  • Work schedulePerform replacement and disruptive work after hours or over weekends/holidays while maintaining building temperature setpoints during business hours. Substantial completion is required by March 22, 2027.
  • Site accessAll workers must submit a BCI background check before arriving on site.

Similar open bids

Original listing

See the original on Bonfire ↗

Bidding it yourself? Get the full package and submit on Bonfire before November 17, 2026.

Get new Utah bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Utah bids → · All states →