This bid is for freight grade separation feasibility studies across Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller counties, Texas, coordinated from 3555 Timmons Ln, Houston, TX 77027.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before December 10, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Study volume: Up to 10 assigned crossing locations and/or corridors over approximately 12 months; no minimum volume guaranteed. Corridors include at least five consecutive crossings along a single roadway.
Analysis: Field reconnaissance, railroad operations data, existing and future traffic conditions, safety assessments, and corridor improvement recommendations.
Concepts: Up to two planning-level alternatives per location recommended for grade separation, including concept drawings and right-of-way, utility, drainage, and environmental constraints; no engineering design required.
Cost and implementation: Planning-level cost estimates, benefit-cost analysis coordination, funding options, and phased implementation strategies.
Coordination: Program management, quality control, railroad and stakeholder coordination, four coordination meetings and up to two public meetings per study location.
Deliverables: Technical reports, concept sheets, evaluation matrices, final reports, executive summaries, and editable supporting data and GIS files.