Replacement: Replace all existing institutional sprinkler heads in inmate cells within Clusters 1, 3, 4, and 5 with new Tyco Raven sprinklers, including labor, materials, and equipment.
Design: Meet NFPA 13 requirements.
Branch piping: Include an allowance of up to 500 linear feet to keep new heads tight against the wall; provide separate labor and material rates per linear foot.
Pricing: Provide a lump sum with separate labor and material totals and estimated completion time.
Site walk: Attendance at one mandatory visit is required: October 26, 2026, at 10:30 a.m. or October 29, 2026, at 1:00 p.m.; meet in the Sheriff Office Training Room at the address above.