Deliverables: Airport Layout Plan with narrative and an 18B obstruction survey, consistent with current FAA Master Plan guidance and Standard Operating Procedures 2.0, 3.0, and 8.0.
Planning: Aviation demand forecasts, critical design aircraft identification, airfield and landside assessments, and public outreach with a digital component.
Alternatives: Airport property land use evaluation, facility requirements and alternatives, and runway safety area evaluations.
Development: Short- and long-term capital improvement plans, height/hazard and land use compatibility analysis, final documents, and meetings.
Schedule: Include completion time in weeks for each phase and the overall project, allowing for revisions and excluding review time.
The basics
Due
November 10, 2026 23 days left
Where
Texas
Posted on
Texas ESBD
Solicitation
RFQ26ALCMRCE00015
What the solicitation documents require
We read the solicitation documents for this bid (1 document, 9 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Due date and time
Response must be received in the TxDOT Aviation eGrants system no later than November 10, 2026, 2:00 PM CST. (rfq26alcmrce00015.pdf, p. 7)
How to submit
Submit through the TxDOT Aviation eGrants system. Firms must be an eGrants user no later than one business day before the due date. (rfq26alcmrce00015.pdf, p. 7)
Submit a Qualifications Statement of no more than nine 8.5x11-inch single-sided pages. QR codes and external links are not permitted. (rfq26alcmrce00015.pdf, p. 3)
Scope highlights
Prepare an Airport Layout Plan (ALP) with Narrative for Commerce Municipal Airport. (rfq26alcmrce00015.pdf, p. 2)
Include an 18B Obstruction Survey consistent with the latest FAA Master Plan Advisory Circular and other Standard Operating Procedures, 2.0, 3.0 and 8.0. (rfq26alcmrce00015.pdf, p. 2)