Airport plan: Prepare an Airport Layout Plan with a supporting narrative.
Survey: Include an 18B obstruction survey.
Planning scope: Assess aviation demand, facility needs, land use alternatives, and a development plan.
Schedule: Provide an estimated timeline in weeks for each phase and the full project.
The basics
Due
October 21, 2026 3 days left
Where
Texas
Posted on
Texas ESBD
Solicitation
RFQ26ALHEARN00098
What the solicitation documents require
We read the solicitation documents for this bid (1 document, 9 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Due date and time
Response must be received in the TxDOT Aviation eGrants system by October 21, 2026, 2:00 PM CST. (rfq26alhearn00098.pdf, p. 7)
How to submit
Submit through the TxDOT Aviation eGrants system. Firms must be an eGrants user no later than one business day before the due date. (rfq26alhearn00098.pdf, p. 7)
Submit one Qualifications Statement of no more than nine 8.5x11-inch single-sided pages, with no QR codes or external links. A prime may submit only one Response. (rfq26alhearn00098.pdf, p. 3)
Scope highlights
Prepare an Airport Layout Plan (ALP) with Narrative for Hearne Municipal Airport. (rfq26alhearn00098.pdf, p. 2)
Include an 18B Obstruction Survey consistent with the latest FAA Master Plan Advisory Circular. (rfq26alhearn00098.pdf, p. 2)