What they need
- Shims and hardwareRepair or replace the split shim block at Pile 3-2; install shims between Piles 8-1 and 8-2 and the cap; replace missing east rail post hardware at Bent 6; tighten the tie rod nut at Bent 5 above Pile 5-1.
- AccessBridge crosses a tidal marsh. Only golf carts and utility carts are permitted on the bridge; plan for below-deck access and pedestrian protection. A site visit is required before quoting.
- ScheduleTentative February 2027 start, with completion within 45 calendar days. Work hours are 7 a.m.–5 p.m.
- PricingInclude all labor, materials, equipment, mobilization, insurance, taxes, permits, and license fees, plus a one-year workmanship warranty.