Pedestrian Bridge Repairs

Structural repairs: Repair Pile 2-1’s connection to the cap and adjacent attached post; restore Stringer 2-5 bearing at Bent 3; repair decay on both faces of the End Bent 1 cap.

Due
December 3, 2026
18 days left
Location
South Carolina
Posted on
scbo.sc.gov
Notice ID
SCBO-70189

The original documents

Deadline: December 3, 2026

See the original on scbo.sc.gov

Bidding it yourself? Get the full package and submit on scbo.sc.gov before December 3, 2026.

What they need

  • Shims and hardwareRepair or replace the split shim block at Pile 3-2; install shims between Piles 8-1 and 8-2 and the cap; replace missing east rail post hardware at Bent 6; tighten the tie rod nut at Bent 5 above Pile 5-1.
  • AccessBridge crosses a tidal marsh. Only golf carts and utility carts are permitted on the bridge; plan for below-deck access and pedestrian protection. A site visit is required before quoting.
  • ScheduleTentative February 2027 start, with completion within 45 calendar days. Work hours are 7 a.m.–5 p.m.
  • PricingInclude all labor, materials, equipment, mobilization, insurance, taxes, permits, and license fees, plus a one-year workmanship warranty.