Electrical equipment: Replace the pump control panel, VFDs, harmonic filters, and Pump #2 motor.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Pennsylvania bid is posted.
What the job is
Lighting and controls: Install wet well lighting, instruments, and a new pump station SCADA panel.
SCADA integration: Include administration building hardware and integration/programming, with $20,000 for hardware and a $10,000 general SCADA allowance.
Installation: Include labor, materials, equipment, demolition, permits, insurance, bonding, and mobilization/demobilization.
Schedule: Complete within 180 calendar days after authorization to begin.