Material: 7,000 cubic yards total of graded medium chip rock from a commercial source, meeting 2024 Oregon Standard Specifications Section 00680 and quality requirements in 00715.10(a), (c), (d), (e), and (f).
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Oregon bid is posted.
What the job is
Delivery locations: 3,000 cubic yards at OR244 (Ukiah-Hilgard Highway), milepost 43.5; 1,500 cubic yards at OR204 (Weston-Elgin Highway), milepost 40.32; and 2,500 cubic yards at OR82 (Wallowa Lake Highway), milepost 26.43.
Stockpiling: Minimum 8-foot pile height, side slopes no flatter than 1V:1.5H, and horizontal layers no thicker than 4 feet. Maximum conveyor drop of 5 feet.
Quality control: Include production sampling, testing, and quality control to verify specification compliance.
Completion: Deliver and stockpile all material by June 25, 2027; early delivery is encouraged.
Pricing: Provide a price per cubic yard for each site, including material, transportation, handling, stockpiling, labor, and equipment.