This bid is for architectural/engineering design and construction oversight for electrical infrastructure upgrades at Southern Ohio Correctional Facility in Lucasville, Scioto County, Ohio.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 20, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Electrical scope: Main campus switch replacement and distribution network upgrades, including switchgear, transformers, wiring, cable, boxes, and conduit.
Design services: Existing-condition surveys, Program of Requirements development, cost estimates, schematic design, design development, construction documents, and bid support. Include a hazardous material survey.
Construction oversight: Construction administration through closeout, with at least eight on-site hours per week during construction, excluding travel, plus progress meetings and written field reports.
Site conditions: Coordinate associated demolition, excavation, concrete work, testing, and commissioning within an occupied maximum-security facility.
Budget and schedule: $4.3 million construction budget; professional services anticipated January 2027 through December 2028, with construction November 2027 through November 2028.
Team: Ohio-registered architect or engineer with electrical engineering support.