Budget: $14,000 total. Specify the number of cubic feet of patching you can provide within this budget.
Cabins 1–15: Approximately 225 sq ft of full-depth repairs, including saw cutting, removal of damaged asphalt and unstable base, subbase grading, compacted aggregate base, tack coat, and hot mix asphalt placed and compacted in lifts.
Natural Resources Road 7: Approximately 1,600 sq ft of pothole repairs, with full-depth repairs where needed. Clean and prepare patches, apply tack coat, fill with hot mix asphalt or approved patching material, and compact flush with surrounding pavement.
Materials and finish: ODOT-compliant asphalt and aggregate base, approved tack coat, and smooth surfaces matching adjacent grades for drainage.
Included costs: All labor, equipment, materials, barricades, traffic control, cleanup, and disposal. Include workmanship and material warranty details.