Projects: Approximately 17 acres of streets, sidewalks, and underground utilities; a 15,112 SF, one-story steel-framed police station; and a 19,449 SF steel-framed fire station with one story plus mezzanine. Provide separate pricing for each project.
Testing: Soil compaction, foundation subgrades, structural fill/backfill, rock excavation verification, stormwater pond clay liners, concrete, asphalt, aggregates, and laboratory testing.
Inspections: Structural steel welding and bolting, reinforced concrete, masonry, soils/foundations, steel decking, joists/girders, seismic connections, and fire penetrations/rated assemblies per applicable plans and North Carolina Building Code Chapter 17.
Reporting: Daily field reports, weekly summaries, deficiency tracking, corrective-action verification, and final compliance documentation. Include short-notice inspection coverage.
Schedule: Infrastructure: March–November 2027; police station: June 2027–July 2028; fire station: July 2027–September 2028.
Qualifications and pricing: North Carolina licensing/certifications and an accredited testing laboratory required. Please provide unit rates for the requested services.
Required meeting: October 23, 2026, at 10:00 a.m. via Teams; invitation required.