The original documents
Deadline: December 2, 2026
See the original on www.bidnetdirect.com
Bidding it yourself? Get the full package and submit on BidNet Direct before December 2, 2026.
What they need
- Doors and hardwareReplace both holding cell doors, frames, hinges, locks, and associated hardware with detention-grade assemblies; anchor, align, and adjust for secure operation.
- Electronic integrationConnect replacement electronic locks to the existing door control system, including wiring, interfaces, and functional testing.
- InstallationInclude labor, materials, equipment, permits, and debris disposal. Coordinate access and security requirements within an operating detention facility.
- Schedule and warrantySubstantial completion by May 30, 2027; include a one-year warranty on materials and workmanship. Allow for 8–10 weeks for submittals and 12–14 weeks for frame delivery after submittal approval.
Get new New Mexico bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More New Mexico bids → · All states →