Scope: Daily operations, inspections, preventive maintenance, repairs, chemicals, sampling, reporting, sludge/residual management, grounds maintenance, and snow removal. Includes a 200,000-gallon-per-day wastewater system and two potable water systems supplied by three wells.
Staffing: Primary and backup New Jersey licensed operators with C-1, W-2, T-2, and S-2 licenses or higher. On-site coverage Monday–Friday, 7:30 a.m.–4:00 p.m.; weekends and holidays, 7:30–11:30 a.m. All times Eastern.
Emergency coverage: Available 24/7 with on-site response within four hours.
Pricing: Separate monthly rates for wastewater and potable water operations; overtime and premium emergency hourly rates; per-task mowing, baling, and clipping removal for approximately 44 acres; and special-project markup, capped at 15%. Include routine repair labor and parts under $250 in monthly rates; approved parts over $250, permit fees, and required outside laboratory fees are reimbursed at cost.
Site visit: Mandatory October 28, 2026, at 10:00 a.m. Eastern; registration required by October 26.