This bid is for fully managed public Wi-Fi services at designated campground areas within selected Nevada State Parks in Nevada. Specific parks and site addresses have not yet been provided.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 3, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Scope: Site assessments, network design, outdoor equipment, installation, testing, internet connectivity and backhaul.
Performance: Reliable coverage throughout designated campground areas with minimum wireless throughput of 300 Mbps.
Access and security: Secure visitor portal with a customized splash page, subscription/payment management, and separation from internal park networks.
Ongoing service: Continuous performance and security monitoring, maintenance, repairs, equipment upgrades and technical support. Include proposed outage response and resolution times.
Business model: Vendor owns the equipment and covers installation and operating costs, with no direct cost to the park operator. Include proposed visitor subscription rates and any additional user fees.
Term and removal: Three years with two optional one-year extensions; remove equipment and restore installation areas within six weeks after service ends.
The basics
Due
November 3, 2026 16 days left
Where
Nevada
Posted on
nevadaepro.com
Solicitation
70CNR-S4044
What the solicitation documents require
We read the solicitation documents for this bid (10 documents, 41 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Professional liability is $1,000,000 each claim and $2,000,000 annual aggregate. A claims-made policy's retroactive date must precede the contract effective date. (70CNR-S4044 Insurance Requirements.docx, p. 2)
Initial contract term is 3 years from Board of Examiners approval, with two optional 1 year renewals if agreed by vendor and in the State's best interest. (70CNR-S4044 RFP for NDSP Wifi Services.docx, p. 2)