This bid is to supply and install outdoor standby generators at five sites in Fairmont, Mountain Grove, Jerico Springs, Romance, and Winona, Missouri.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Missouri bid is posted.
What the job is
Generators: Propane fueled, air cooled, at least 14 kW, 120/240 V single phase, with automatic voltage regulation and battery trickle charging.
Installation: Remove and dispose of each old generator, connect the propane line and regulator, and leave each backup system operational. Reuse the existing transfer switches.
Schedule and support: Complete delivery and installation within 180 days of order; include a one year warranty and on site warranty service.