What they need
- Snow stopsMatch the existing style and profile along the full length of both sides, filling gaps on the east side and installing new stops on the west side. Fasten top edges into wood purlins.
- GuttersInstall 5-inch seamless aluminum gutters on the east side only, attached to the fascia below the steel eave trim.
- DownspoutsInstall two, each 17 feet inward from its respective gutter end, discharging onto rock approximately 2 feet from the building.
- SealantPreclean sealing areas with denatured alcohol and use Vulcem 116 at downspouts and end caps.
- Site visitRequired by November 23, 2026; verify measurements and existing conditions.