What it takes to win this job
No close past price for this exact job. We found fewer than 3 past awards for this same work, which is too few to give a fair price.
Price it from your own costs. Ask the buyer what they paid the last time they bought this.
To win it, you need
- Electrical license: Provide your current Massachusetts electrical license number and holder’s name.
- Past projects: Provide references for at least three similar electrical projects completed within the past five years.
- Required forms: Submit a signed cover letter, qualifications statement and completed Exhibits A, B, C and H.
- Email deadline: Email your quote in PDF format to wbrown@pvta.com by December 11, 2026 at 2:00 PM EST.
- Lowest price: PVTA will award to the responsible bidder meeting minimum qualifications with the lowest total evaluated price.
The original documents
Deadline: December 11, 2026
- RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications PDF · 91 pages
- Attachment No. 1 Electrical Mod Drawing Set PDF · 11 pages
See the original on www.commbuys.com
Bidding it yourself? Get the full package and submit on COMMBUYS before December 11, 2026.
What they need
- ScopeUpgrade wiring at 10 shelters and 7 canopy stops for 34 owner-furnished displays and associated berth number signs. Displays will be installed by the owner's staff.
- WiringRemove existing display cables and connectors; hardwire supplied 10-foot outdoor power cords to junction boxes. Replace sign wiring with approximately 100 feet total of 18 AWG, 3-conductor, unshielded, 300V polyurethane-jacketed cable, Alpha Wire 25063 or approved equal.
- Canopy boxesProvide unit pricing to replace up to 7 junction boxes with adequately sized weatherproof boxes where needed, retaining circuit switches.
- Circuit workInstall a new 20A canopy breaker and re-feed one berth, including wiring, raceway and labeling. Diagnose the tripping breaker serving Berth 10 and provide a written repair recommendation and separate repair price.
- CompletionInclude labor, materials, equipment, permits, inspections and operational testing. Massachusetts electrical licensing and applicable prevailing wage rates are required.
- ScheduleStart within 15 calendar days of authorization and finish within 15 business days after starting, coordinated with display installation and ongoing terminal operations.
What you have to submit
Pulled from the 2 solicitation documents (102 pages). Each item links to the page it came from. Check the originals and any amendments before you bid.
2Deadline
- General Information Request for Quotes (RFQ) #27-005: Springfield Union Station Bus Berth Display Replacement Project, Electrical Modifications QUOTES DUE: Friday, December 11, 2026 @ 2:00 PM EST Contact: Wesley Brown, PVTA Procurement Officer, wbrown@pvta.com Quotes must be submitted in PDF format...Source: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 2
- #27-005: Springfield Union Station Bus Berth Display Replacement Project, Electrical Modifications QUOTES DUE: Friday, December 11, 2026 @ 2:00 PM EST Contact: Wesley Brown, PVTA Procurement Officer, wbrown@pvta.com Quotes must be submitted in PDF format by emailSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 2
- Friday, December 4, 2026 Quotes dueSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 7
3Forms to fill out
- Payment bond
- Performance bond
- Wage determination
5Bonds and insurance
- 6A.3 Payment Bond If the contract price is more than $25,000, the Contractor shall furnish a payment bond in the amount of fifty percent (50%) of the contract price, issued by a surety company licensed to do business in Massachusetts, within ten (10) days after notice of awardSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 11
- No bid deposit or performance bond is requiredSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 12
- Minimum limit Commercial General Liability: each occurrence / general aggregate $1,000,000 / $2,000,000 / / products-completed operations $2,000,000 Business Automobile (owned, hired and non-owned), combined $1,000,000 single limit Workers’ CompensationSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 22
- 152) Employers Liability: each accident / disease each employee / $500,000 each disease policy limit Umbrella / Excess Liability, per project aggregate $5,000,000 Installation floater (materials and equipment the ContractorSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 22
6Licenses you need
- 6A.5 Licenses, Permits and Inspections The Contractor shall hold all licenses required by Massachusetts law for the work, obtain the electrical permit, and arrange and pass all required inspectionsSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 12
- You must provide any updated PWS to all contractors working on the issued by DAS shall be attached to the certified payroll recordsSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 25
- You must keep the contractors’ weekly certified payroll records and performed, you must ask DLSSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 25
- Additional Apprentice Information All apprentices must be registered with the Division of Apprenticeship Training(DAS) in accordance with M.G.L.cSource: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 54
- must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following: (1) That the certified payroll for the payroll...Source: RFQ 27-005 Springfield Union Station Bus Berth Display Replacement Electrical Modifications, page 84
Other recent awards in this industry in Massachusetts
Recent federal contract awards (federal buyers) in the same industry in Massachusetts, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
| Who won | Amount | Buyer | Date |
|---|
| Infra-Red Building & Power Service, INC.Automatic transfer switch (ATS) testing & imaging services |
$22,465 | Department of Veterans Affairs | Sep 2026 |
| True Circuit Electrical Testing L.l.c.Electrical switch repair |
$34,585 | Department of Veterans Affairs | Sep 2026 |
| John W Neal IiBase housing streetlights replacement project |
$14,725 | U.S. Coast Guard | Sep 2026 |
| Classic Site Solutions INCLowell national historical park - security upgrades |
$1,171,419 | National Park Service | Sep 2026 |
| Atz Solution LLCElectrical inspection and repair services at Boston national historical park (BOST) the national park service … |
$100,000 | National Park Service | Sep 2026 |
| Johnson Controls Fire Protection LPRepair fire alarm south weymouth, MA |
$7,000 | U.S. Coast Guard | Aug 2026 |
| Doyon Contracting Services, LLCProvide 100-AMP service to the subpanel |
$54,441 | U.S. Coast Guard | Aug 2026 |
| Northern Electric INCThis procurement is for the structured cabling and install of four conference rooms and six already existing v… |
$212,400 | Department of the Air Force | Aug 2026 |
Losing bids are not made public on most government buys, so only the winner and price are shown.
Get new Massachusetts bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More Massachusetts bids → · Electrical bids in Massachusetts → · Inspection & Testing bids in Massachusetts → · All states →