XL Eagle Send us your price
Hawaii bid · open for prices

Wastewater Pumping and Disposal

Duration and volume: Twelve months, with up to 8 loads per month across two septic tanks, at 1,500 gallons per load; up to 96 loads total.

Due
November 11, 2026
14 days left
Location
Hawaii
Posted on
hiepro.ehawaii.gov
Notice ID
B27000641

What they need

  • Tank detailsEach tank is approximately 6 feet wide by 8 feet deep; one is near the harbor office and the other near the restroom next to Haleiwa Road.
  • Response timesProvide routine service within 24 hours of contact and emergency response within 12 hours, with a contact number available at all times.
  • QualificationsDOH-certified pumping company authorized to dispose of wastewater at a DOH-approved treatment plant, with applicable permits, licenses, and insurance.
  • PricingInclude an all-inclusive rate per load, monthly pricing for 8 loads, and a 12-month total, including disposal, taxes, and fees. Additional and emergency loads must use the same per-load rate.
  • How longThe CONTRACTOR asserts a claim for such an adjustment within thirty (30) days after the end of the period of performance stoppageSource: AG-008 103D General Conditions (1.10.23).pdf, page 5

What you have to submit

Pulled from the 3 solicitation documents (41 pages). Each item links to the page it came from. Check the originals and any amendments before you bid.

1How and where to submit

2Bonds and insurance

3Licenses you need

4Pricing format

Past history: who won Water & Wastewater work in Hawaii

Recent federal contract awards (federal buyers) in the same industry in Hawaii, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.

Typical award: $108K to $5.4Mmiddle half of 15 recent awards · median $2.7M
Who wonAmountBuyerDate
Jba Construction LLCSewer line repairs at u.s. coast guard base honolulu, hawaii $3,301,193U.S. Coast GuardJul 2026
Pural Water Specialty Co. , INC.Asbp water valve repair $13,897U.S. Coast GuardJun 2026
Ses Energy Services LLCPreventative maintenance for usag-hawaii pipeline, US army corps of engineers, huntsville center $9,538,130Department of the ArmySep 2025
Haloa Construction LLCPerl relocate chilled water pump IAW construction specifications $625,187Departmental OfficesAug 2025
Pure Enviro-Management, LLCPuho replace components to wastewater system $2,733,051National Park ServiceAug 2025
Doonwood Engineering INCPerl theater lift station $19,250National Park ServiceJul 2025
Mocon CorporationManhole repair $28,963U.S. Coast GuardMar 2025
Pure Enviro-Management, LLCRehabilitate HVC stormwater system $4,430,258National Park ServiceFeb 2025

Losing bids are not made public on most government buys, so only the winner and price are shown.

Similar open bids

Files (3)

See the original on hiepro.ehawaii.gov ↗

Bidding it yourself? Get the full package and submit on hiepro.ehawaii.gov before November 11, 2026.

Get new Hawaii bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Hawaii bids → · Plumbing bids in Hawaii → · Water & Wastewater bids in Hawaii → · All states →