This bid is to recoat the Washington Place Beretania Street driveway in Honolulu, Oahu, Hawaii.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Hawaii bid is posted.
What the job is
Preparation: Clean the pavement and remove debris, vegetation, and oil.
Cracks and low spots: Clean cracks wider than 1/8 inch and fill with hot-applied rubberized sealant; level depressions with suitable asphalt patching material.
Topcoat: Apply two coats of sealcoat with sand and latex polymers, allowing 2–4 hours of curing between coats.
Traffic control: Barricade the area for 24–48 hours after coating. Complete the work by October 20, 2026.