Vessel: White Gibson houseboat, approximately 41 feet long, hard aground. Verify dimensions, condition and access before quoting.
Due
December 3, 2026
12 days left
Location
Cantonment, FL
Florida
Posted on
OpenGov
Notice ID
WM2722-20261119
Please quote removal, transport and disposal of one derelict 41-foot White Gibson houseboat aground on the shoreline of Santa Rosa Sound, east of Range Point, Escambia County, Florida, for disposal at Perdido Landfill, 13009 Beulah Rd., Cantonment, FL 32533.
Vessel: White Gibson houseboat, about 41 feet long, hard aground; verify size, condition and access before quoting.
Removal: Refloat if needed, tow, extract via water, and haul to Perdido Landfill, with all tipping fees included. No salvage allowed.
Site protection: Shallow-draft equipment and upland staging, plus turbidity barriers, monitoring and habitat protection. Daylight hours, Monday to Friday only.
Contaminants: Remove and properly dispose of pollutants and the engine before extraction, with licensed fuel and sewage/greywater pump-outs. Fuel tanks over 20 gallons must be removed, perforated and flattened.
Schedule: Start within 7 calendar days of authorization and finish within 14 calendar days.
Insurance: Marine liability and pollution coverage of $1 million per occurrence/$2 million aggregate, applicable employee coverage, and an insurer letter confirming the required coverage can be obtained.
Please confirm availability and send your quote by December 3, 2026.
The original documents
Deadline: December 3, 2026
See the original on procurement.opengov.com
Bidding it yourself? Get the full package and submit on OpenGov before December 3, 2026.
What they need
Removal and disposalInclude refloating if needed, towing, extraction via water, transport to Perdido Landfill, 13009 Beulah Rd., Cantonment, FL 32533, and all tipping fees. No salvage permitted.
Site protectionUse shallow-draft equipment and upland staging; include turbidity barriers, monitoring and habitat protection. Work is limited to daylight hours, Monday–Friday.
ContaminantsInclude removal and proper disposal of pollutants and the engine before extraction, licensed fuel and sewage/greywater pump-outs, and hazardous-material handling. Fuel tanks over 20 gallons must be removed, perforated and flattened.
Schedule and recordsBegin within 7 calendar days of authorization and finish within 14 calendar days. Include daily reports and photos documenting removal, destruction and disposal; final documentation is due within 3 calendar days of disposal.
InsuranceInclude marine liability and pollution coverage of $1 million per occurrence/$2 million aggregate, applicable employee coverage, and an insurer letter confirming required coverage can be obtained.
Other recent awards in this industry in Florida
Recent federal contract awards (federal buyers) in the same industry in Florida, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.